The blown film extrusion line had become unusable due to malfunctions in the control equipment, communication failures, and lack of service. In terms of equipment level;

  • Dosing units
  • Gravimetric Line Inspection
  • IBC Balloon cooling and measurement control system
  • Kundig profile measurement and correction system
  • Film line tension control system
  • Edge control system
  • To the automatic winding system

It was a production line with various components. All equipment, operating with separate, independent control systems, was integrated into a central system. All power and control equipment was renewed, and all system software was updated. The production line was brought back into the economy using equipment suitable for today's modern conditions.

Project Stages

Project Result